STREAMLINE SERVICES
ALG aims to provide a full solution for its Clients as a comprehensive water management concept based on flexible solutions designed to Oil & Gas operators and Oilfield Services companies.
Streamline service provides water for the fracking operation from the well source to the rig site.
Steps Through Water Processes

- HOSES
- Sizes: Ranging from 6″ up to 12″ diameter
- Blend of Nitrile Rubber and PVC
- UV Resistant
- H₂S Resistant
- Burst Pressure: 42 bar
- Wall Thickness: 3.8 mm
- Operating Temperature: Ranging from -30°C to +75°C
- REELERS
- Skid-mounted vertical reeler system, complete with hydraulic power pack, driven by a diesel engine.
- Removable heavy duty hose reel cassette, complete with storage cradle and lifting beam.
- Separate hydraulic oil tank.
- Hose deployment and retrieval from rear of skid.
- Cassettes to store 6 x 200 metres x 6” diameter lay-flat hose with couplings or 4 x 200 metres x 8” lay-flat hose with couplings.
- BOOSTER PUMPS
- Customized Booster pump, providing the required operation system to transfer water from the AGST to the fracking site.
Sizes: 8″ to 12″ Pump or as per Client required.
Capacity range: 60 – 80 BBL/Min or as per Client required


- ABOVE GROUND STORAGE TANK
- Capacity: Ranging from 5,000 BBL to 80,000 BBL
- Capable to operate in Extreme Weather Conditions
- Resistant to handle H2S content
- A superior grade of Water-Proofing Membrane
- Operating Temperature: up to +70°C
- Warranty of 10 Years on Manufacturing Defects